In response to the needs and opinions put forward by users, engineers gave solutions to satisfy customers in a short period of time after on-site surveys and field visits.

Reasonable Layout To Solve Site Planning Needs

The  project team organized engineers to carry out detailed surveys on the customer’s site, and carried out reasonable planning and layout in the space reserved by the customer to solve the customer’s site planning needs.

On-time Delivery To Help Rapid Production And Profitability

In order to achieve the speed of production line construction that customers want, after signing the order, formulates detailed production, ready-to-deliver, basic production and engineer dispatch installation and commissioning plans to ensure that the final delivery is completed on time, so that customers can quickly put into production and profit quickly.

Environmental Protection Intelligence To Ensure Automation

Loading, grinding and finished product transportation and storage are equipped with pulse dust removal equipment to ensure that the production site is clean and environmentally friendly without dust pollution. High degree of automation, equipped with PLC intelligent control cabinet and remote central control system, saving labor costs and simple and fast operation.

Improve Equipment Quality, Reduce Costs And Increase Efficiency

The suspension roller mill used in this project has a service life that is 1.7-2.5 times the life of traditional wear parts; some wear parts adopt a combined design, which can more effectively save the use cost of wear parts and reduce costs and increase efficiency.

Leave a Reply

Your email address will not be published. Required fields are marked *

Chinese Deutsch Espanol Francais Italiano Portugues Japanese Korean Arabic Russian