With the development and progress of gypsum industry, the need of gypsum powder is growing, also with the quality of gypsum powder. During the whole procedure, the drying and dehydration are the key link, and it is also the difficult part. According to such a condition, after many years researching and exploring, we have developed a new generation dehydration device which are suitable for all kinds of gypsum production demand boiling furnace.

The nature gypsum ore is crushed into small particles(under 15mm), then send into the raw material silo by the No.1 bucket elevator. By the vibrating feeder, the gypsum granular are fed into roller mill to grind into 100-200 mesh powder. Then flow into the transit(buffered) silo by the No.2 bucket elevator.

With the dosing screw conveyor the gypsum powder is fed into furnace boiler and reaches the material bed area. The roots blower under the kettle blows the air into furnace to let the gypsum powder into boiling statue. There are many coil pipes in the materials bed area, the heat conductive oil is circulated in the tubes, release the heat into the inside of furnace. Under a certain temperature, the dried and dehydrated powder become light, and flow to the outlet automatically. There is the dust catcher to collect the dust and air at the roof of kettle, to make sure the boiling gypsum powder in the balance condition.

After the calcining progress, the qualified powder will flow out to the No.3 bucket elevator. By the lifting, the powder is transported into the final powder silo. After the temperature decrease down, the calcined gypsum powder is packed into 25kg or 1 tons jumbo bags.

Leave a Reply

Your email address will not be published. Required fields are marked *

Chinese Deutsch Espanol Francais Italiano Portugues Japanese Korean Arabic Russian