All posts by: gkmill

About gkmill

1. The working site   Prepare a flat gound, the place needs to spearate the raw materials storage area, the crushing and grinding area, the collecting place, the final powder storage area, the loading area and the office area.Speicaluser bulid the workshop and concrete foundation for the grinding area and final powder storage area, the […]

One, High-pressure, high-density, low-pressure feed system of Pneumatic Conveying Equipment         Low-grade high-pressure, high-density, low-speed pneumatic conveying (dense phase conveying) has been used for 40 years in mixed material overseas. It not only solves the problem of classification, but also solves the problem of pollution and product material, which other forms of […]

Ball mill has features of high operation rate, grinding effect, and we must follow close to the line of the operation procedures and maintenance procedures of ball mill. 1.Before the start ball mill, you should check whether the connection bolts are tightened, and tightening condition of the spoon head of the ore feeder, and key […]

1、Advantage introduction ①High crushing ratio and high production capacity. ②Fine particle size, more uniform, high classification efficiency. ③High efficiency dust collection 99%, green more environmental protection, no dust production. ④Easy maintenance, small wear, longer service life and good shock absorption. Post Save Draft

(1)Advantages of Raymond Mill   As an environmental protection mill, the Raymond mill has many advantages, good performance, stable operation, high cost performance, and more grinding materials, which can meet the production of 80-400 mesh powder. Compared with R-type machine, it can increase production by more than 40%, save 30% of power consumption, and the […]

Chinese Deutsch Espanol Francais Italiano Portugues Japanese Korean Arabic Russian